sap upgrade from 4.6c non unicode to ECC EHP 7 unicode

Hi,

We are planning to upgrade from R/3 4.6c Non-Unicode to ECC6.0 EHP7 Unicode.

Source 1:

DB : oracle 8.1.7.4

OS: Window server 2003 R2

SAP: R/3 4.6c Non Unicode

Source 2:

DB: Informix 7.31

OS: Windows server 2000

SAP: R/3 4.6C Non Unicode

Target:

DB : Oracle 12.1.0.2

OS: Windows Server 2008 R2 64 bit

SAP: ECC 6.0 EHP 7 Unicode

Kindly guide me upgrade process based on above scenario.

Also clear me that we need to upgrade DB first or can do directly from existing DB version to latest one in one step upgrade.

Regards,

Dev

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

7 Answers

  • Best Answer
    avatar image
    Former Member
    Feb 07, 2017 at 12:58 PM

    Hi,

    the steps are:

    1. Upgrade OS/DB to the required level (the minimum requirements which are needed for EHP7). As stated by Reagan this has to be done via System Copy (Target: Win2008/Oracle11)
    2. Prepare your system for the Unicode Conversion (See CUUC guide)
    3. Upgrade your System
    4. Perform the Unicode Conversion incl. Upgrade to Oracle 12

    The Unicode Conversion is from a technical point of view a System Copy. So you can upgrade your database from Oracle 11 to Oracle 12 during the process.

    Best regards,
    Andreas

    Add comment
    10|10000 characters needed characters exceeded

  • Feb 07, 2017 at 12:00 PM

    Follow the recommendation given by Andreas. As Microsoft does not support in-place upgrade you need to perform a system copy to get the system on supported OS/DB before starting the upgrade to EHP7. So the target OS and DB after the system copy should be Oracle 11G latest patchset with Window server 2008 R2. You cannot go to Oracle 12c at this stage as the source system is still 4.6C and Oracle 12c is supported only for NetWeaver based products with a kernel set of 7.21_EXT. 2133079 - Oracle Database 12c: Integration in SAP environment. You do not need to perform a database upgrade from 11g to 12c as the target system can be setup with 12c while perform the export/import. You just need the Oracle 12c software to be installed with the latest SBP.

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Feb 09, 2017 at 02:46 PM

    Hi,

    please check note 990312 regarding Informix databases:

    • IBM Informix database platforms in conjunction with SAP products, based on SAP basis version >= 7.00 are NOT supported by SAP.


    So, the roadmap could be nearly the same:

    1. Upgrade OS/DB to the required level (the minimum requirements which are needed for EHP7). As stated by Reagan this has to be done via System Copy (Target: Win2008/Oracle11). During this system copy you switch from Informix to Oracle and Upgrade Windows to 2008.
    2. Prepare your system for the Unicode Conversion (See CUUC guide)
    3. Upgrade your System
    4. Perform the Unicode Conversion incl. Upgrade to Oracle 12


    Cheers,
    Andreas

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Feb 03, 2017 at 01:19 PM

    Hi,

    If the target is an unicode, you have to perform an "export" (R3 load) of the database and import it. on the target, so you will have to follow the instructions for an heterogeneus system copy. In the cae of the informix that is even clearer

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Hi Andreas,

      Thanks for valuable inputs.

      As per your roadmap I am following below steps.

      1. Upgrade OS from Window server 2003 R2 to Window server 2008 R2

      2. Upgrade Oracle Database from Oracle 8.1.7.4 ==> Oracle 10.2 ==> Oracle 12.1.0.2

      3. Preparation of Unicode conversion & Upgrade system

      4. Unicode conversion with upgrade to oracle 12.

      From above I am confused with last step (4th) i.e. upgrade to oracle 12. since we are performing DB upgrade in step 2.

      Kindly suggest and correct above steps.

      Regards,

      Dev

  • avatar image
    Former Member
    Feb 09, 2017 at 04:56 AM

    Hi All,

    Thanks for providing valuable steps.

    Please suggest roadmap based on Informix to oracle as well.

    Thanks in advance.

    Regards,

    Dev

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Feb 10, 2017 at 07:47 AM

    Hi All,

    Thanks for providing valuable guidance. I will post the process once complete the upgradation.

    Special thanks for Andreas.

    Regards,

    Dev

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Apr 21, 2017 at 01:19 PM

    Hi Dev,

    Please let us know the steps you have followed for above scneraio

    Regards,

    Mahesh

    Add comment