on 10-13-2015 1:46 PM
Hi All,
I have a network in my project. One Internal activity underneath this network is confirmed. Now I need to change the Costing Variant (actual) for this network. The system gives me error (obviously because activity is confirmed). Is there anyway I can change this costing variant. Since this is a demo project, I am ok to delete the activity or whatever other changes are needed. I need this change because Actual Costs are not getting calculated on the project (because the current costing variant set in this field refers to plan costs).
Hi Ashwini,
You will need a new network with a different costing variant.
Regards,
Paulo
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Ashwini,
I think cost variant is not the reason for actual cost calculation, not sure.
Goto opuv and select the network type and change costing variant. and better create new project and try to book confirmation and see whether actual cost is getting calculated or not.
Thanking you
Vengaiah
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
103 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.