Hi everyone,


I just completed installation of SAP NetWeaver 7.4 ABAP Stack. Tried installing Add-On in SAINT (BI Content) and i received the following error:

The installation was stopped, since an error occurred during the phase DDIC_ACTIVATION, which the Add-On Installation Tool is unable to resolve without your input.

Error in phase: DDIC_ACTIVATION

Reason for error: TP_STEP_FAILURE

Return code: 008
Error Message: OCS Package SAPK-747ADINBICONT, tp step "A", return code 008

I could not delete the queue as it says "You cannot delete the queue from import phase DDIC_ACTIVATION"

Please help😢

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    Posted on Oct 13, 2015 at 07:49 AM

    Hi

    Check if you are facing the smae issue described in KBA : 2090264 .

    BR,
    Gaurav

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.