Change Number handling at Item Level.

Hello Guru's

I would like a generate separate change numbers for each BOM Items added to my engineering record.So that each BOM can have their own valid from date. I think i can achieve this through change number handling at Item level.

I need expertise advise to see if I can automate this so that a change number gets generated automatically for each BOM item.I can use the method CREATE_ECN_AT_ECR_ITEM.

Suggestions would be helpful.

Thanks & Regards

Jo Pz

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • Best Answer
    avatar image
    Former Member
    Oct 08, 2015 at 02:44 PM

    Hi Jo,

    IS it not possible with SPRO configuration Make setting for Engineering Record -->  Change Number Handling at Item level.

    It should work I believe,

    Thanks and regards,

    Niketan

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Hi Niketan,

      Yes, I was able to create change master at Item level.But I would like to know if I use this method CREATE_ECN_AT_ECR_ITEM, is it possible for me to create the change number automatically with a similar number range of the Lead change number.

      For eg: If my lead change number is 15102015, I would like to have my change master at the item level by 15102015-1, 15102015-2.....etc.

      Kindly advise.

      Jo