cancel
Showing results for 
Search instead for 
Did you mean: 

SOAP to SAP

former_member188353
Participant
0 Kudos

Hi All,

we have recently upgraded the PI system from 7.11 to 7.31  and also ECC system, i'm having a scenario of SOAP to ECC,i have provided the new WSDL from 7.31 to my clients.

But my issue is after consuming the new WSDL from 7.31 also messages are going to the old EQ1 system i need to send the messages to the upgraded new ECC system. can any body help me to resolve the issue.

Regads,

PR.

Accepted Solutions (0)

Answers (4)

Answers (4)

praveen_sutra
Active Contributor
0 Kudos

Hi PR,

Please check the target RFC destination u are using to post the message to the target system.

& Alternatively please check if the sender system is not sending data to old PI system.

hope this helps.

thanks and regards,

Praveen T

former_member186851
Active Contributor
0 Kudos

Hello,

Change all your settings like SM59 and Channel configs pointing to new ECC System.

iaki_vila
Active Contributor
0 Kudos

Hi P R,

You can connect to ECC via RFC, Proxy or IDOC. If the messages go to the old system and you have changed all the receiver channels, you can try to refresh the CPA cache.

Regards..

Eduardo_Rubia
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hi, PR,

Without further details on the end-to-end scenario, it's hard to tell precisely.

But here goes a shot in the dark: if you haven't changed your interface determination, I'd guess that your receiver determination might pointing to the old ECC.

Worth checking that.

Otherwise, better help will come if you share more details.

Regards,

Eduardo

former_member188353
Participant
0 Kudos

Receiver determination is fine,it is pointing to new System only.

What else you need?

Regards,

PR.

Former Member
0 Kudos

Hello P R,

You can check once the technical system name used in SLD, if its the new system.

Regards,

Souvik

Eduardo_Rubia
Product and Topic Expert
Product and Topic Expert
0 Kudos

By more details I mean the end-to-end description of the scenario. Where does it start and where does it end?

The cache refresh idea given below is interesting if you're sure the routing conditions are consistent. If that doesn't shed any light, then I'd take an XPI Inspector trace for the communication channel and track what is going on.

Good luck,

Eduardo