With reference to the capacity planning function for PM orders, we can assign splits(personnel numbers) to an operation.

Dispatching is carried out via CM25 and other planning boards, however when we select the dispatch indicator manually to the split (requirement assignment tab)no status is set in the status tables?

Which table can we see this indicator set?

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Sep 21, 2015 at 03:28 PM

    Gaurav B


    The DSPT status is set against the operation.


    See table JEST using the operation object number (AFVC-OBJNR e.g. OV100041281600000001).


    PeteA

    Add a comment
    10|10000 characters needed characters exceeded

    • thanks Pete,

      I did check that however,the status is not set in JEST for operations where the tick box is set manually.(I'm referring to the dispatch check box if set manually by the user in the order requirement assignment tab)

      If we use CM25 then the tick box is set in the order and a corresponding system status DSPT is set in the table.

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.