Standard cost issue

former_member219500
Participant
0 Kudos

Hi...Every One

When I was ran the standard cost estimate (ck11n),my activities value not updated. Can any one suggested to me

Regards

P.Kittu

Accepted Solutions (0)

Answers (1)

Answers (1)

kamalkumar_biswas2
Active Contributor
0 Kudos

Hi Kittu

  It can br for many reasons..at least check the following areas:

  1. Whether you have activity price updated in KP26  or can see in KSBT report

  2. In routing activity type is defined with proper formula see in ca02/03

  3. Production version is defined in Material Master of your product

  4. Selection ID of routing is properly defined in Costing variant

Kamal

former_member219500
Participant
0 Kudos

Hi...kamal

I have the done the kp06 plan  and kp26 kspi ran and also KSBT Report

routing and bom every thing is fine .still not update the price

Regards

P.Ramakrishan

kamalkumar_biswas2
Active Contributor
0 Kudos

Hi

Have you define production version in mat master MRP4?

Also check costing variant -qty structure - routing ID

Kamal

former_member219500
Participant
0 Kudos

hi...kamal

I am maintain the BOM and routing not combination of BOM and Routing(production version),why I am maintaing the production version MRP4 . I have selected the with quantiy structure in material master. I am not working the repatative industry .I think production version related to repetitive industry. routing id also I have checked

rajneesh_saxena
Active Contributor
0 Kudos

Hi

If every thing you have found OK then from my side check following also:

1 Maintain bigger costing lot size say 100 or 1000 in mat master

2 At OKTZ check that cost component for activity is relevant for inventory valuation.

Rajneesh

kamalkumar_biswas2
Active Contributor
0 Kudos

Hi

In Mat Master there are 2 areas ..one is prod version and another is REM. For manufacturing order you have to maintain prod version and for REM you have to define REM profile...

If you define prod version your issue will be solved.

kamal

kamalkumar_biswas2
Active Contributor
0 Kudos

Hi Kittu

   Sorry...You have no other alt BOM for your material so need not to maintain prod version..I have overlooked..but if you have other alt BOM for that material then prod version to be maintained.

  In that case check what Rajneesh has suggested and also see that in Material Master "Prod resource tool" task list usage is properly defined

kamal

Former Member
0 Kudos

Hi Kittu,

Please check the MRP View on procurement Type,  If its not " E " then system  is ignoring  your routing. Do the master data change, run the standard cost estimate.

Regards,

GODA.