Is it Possible to create quota arrangement without MRP run? Please explain

Thanks

Add a comment
10|10000 characters needed characters exceeded

Related questions

6 Answers

  • Posted on Sep 16, 2015 at 07:21 AM

    Hi, You can include the quota to MRP so as in such a way system considers the quota for allocating the proposals come from MRP to the individual internal or external vendors .Quota is not a available stock . Please check the below link https://help.sap.com/saphelp_46c/helpdata/en/f4/7d265244af11d182b40000e829fbfe/content.htm Regards,

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Sep 16, 2015 at 07:32 AM

    Please include this answer in my above post . For your question , answer is yes . You can control this through the quota arrangement usage indicator . Under spro--mm--purchasing--quota---auota usage indicator . I paste the screen shot .


    F3.jpg (13.6 kB)
    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Sep 16, 2015 at 09:04 AM

    Hi,

    You can follow the steps

    inforecord should be maintained to create quota... | SCN

    Regards,

    Biju K

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Sep 16, 2015 at 09:40 AM

    Hello,

    You will get details from this link

    Configure Quota Arrangement in SAP MM

    Thanks

    Mahesh

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Sep 16, 2015 at 01:33 PM

    Hi Abirami,

    The main concern of the quota arrangement is to split the proposals through MRP run as per the percentage and which you have fixed in the source list

    with out MRP as per my knowledge you have split the quota manually for PR creation..

    MRP Functionality :

    while running the MRP system will check the MRP Type as well as lot size if the lot size is enabled with consider quota, MRP 3 Quota usage then it will check the source list what are fixed vendors with MRP Relevant

    according to the source list fixing system will check the quota percentage for generating the MRP Output (Proposals i.e. PR or Schedule lines)

    Regards,

    Venkatesh

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Sep 16, 2015 at 09:04 PM

    The main purpose is to split requirements between different sources. It is not necessary that this is done from MRP directly, it can be achieved well from manually created requisitions.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.