Planned orders not being scheduled

Planned orders in my plant are not being scheduled properly. I checked for a valid routing for the material and that exists. When I go into the planned order, the detailed scheduling and rough cut tabs are not visible. I can go into the planned order, hit "Shift F6" to manually schedule the planned order and at that point the tabs appear. Why will it not do this automatically? I have 1200 planned orders in my MRP queue that I want to do this to so I can see overall capacity requirements for the work centers used in those routings/materials but do not want to go through 1200 manually and do this. Can anyone help?

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Posted on Sep 14, 2015 at 04:47 PM

    Hello

    Check the steps described on the following note:

    2120367 Planned orders generated from MRP don't have the tab "Detailed scheduling"

    BR
    Caetano

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Sep 14, 2015 at 05:17 PM

    Sorry, I'm new to the SCN. What is that Note that you're referring to? Is that another post on this forum?

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.