Hi,

We are changing a plants MRP type from PD to Reorder point with external requirements within the lead time(ZZ).The only thing I want the new MRP type ZZ to do is to calculate how much to procure based on re-order point level, receipts/requirements and DO NOT consider Forecast to come up with a proposal as checked in OMDQ within the lead time.

ZZ New MRP Type:

Also, the current plant is live using PD as MRP type with the following settings,

Current PD MRP type settings:

My concern here is what should be my settings on my ZZ reorder point MRP type so that VSF reductions are not affected and it should work the same way as we are doing today, Sales order that are currently being put into this existing live plant is not being affected and must consume forecast as the same way. I am sure I do not want to consider forecast to plan in re-order point.


Thanks

MRP_1.png (16.2 kB)
MRP_2.png (25.9 kB)
Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Sep 21, 2015 at 04:14 PM

    Hello,

    Can any one assist me on this ? thanks

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.