Pre Dispatch Inspection Of material from Purchase side.

Hello,

I have one client requirement ,they want pre dispatch inspection of material before delivery.Scenario is that they buy some material from vendor and vendor manufacture the product according to my client requirement so they want inspection before deliver the product.Please suggest the solution how to map the process in the system and what are the steps to do fulfill this requirement.

Thanks

Rahul

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

3 Answers

  • Sep 03, 2015 at 03:42 PM

    I beleive this is source inspection, not delivery before shipping.

    The OP should do some research on source inspections at vendor and reveiw standard SAP functionality and help files.  Then come back with specific questions.

    Craig

    Add comment
    10|10000 characters needed characters exceeded

    • You might got it right Craig! 😊 I thought OP's client  purchases some material from vendor and sells to their customer and wants pre-dispatch inspection at this stage! 

      Anand

  • Sep 03, 2015 at 02:45 PM

    If you want inspection before dispatch you should active inspection type 10 in material master. That will trigger inspection lot with reference to outbound delivery. You will not be in a position to post PGI unless you clear this lot. You may need to do customization as well QCC0 > Quality Inspection > Inspection Lot Creation > Inspection at Shipping > Assign Inspection Lot Origin to Delivery Type

    Anand

    Add comment
    10|10000 characters needed characters exceeded

  • Sep 03, 2015 at 04:24 PM

    Hi Rahul,

    Craig was right!! It's source inspection which you can search in SCN/Google. You can get this process with adding inspection type 0101, in your material master. But that would be linked to GR against PurOrd. But I think you already said you are trying to check the quality before physically doing GR/PGI.

    Now I again put on my enhancement hat 😉 to provide a quick fix -

    a) Create a inspection lot of type 89, manually by introducing the receiving material. Note that in the inspection text, you can add PurOrd number as reference.

    b) Once you try to create GR for this PurOrd, system should check back this 89 inspection lot, if the  UD = A. If so, allow the GR for material.

    NOTE: In this case, as the quality is already tested before, you don't need again to create another 01 inspection lot, unless you are testing some external characteristic, like carton quality, packaging quality, storage conditions, etc etc.

    I am open for any further good suggestions.

    Thanks,

    Arijit

    Add comment
    10|10000 characters needed characters exceeded

    • Another option could be using QM in Procurement => Certificate processing with Control Key - 0005, where GR for source control "X" if selected, then rejected inspection lots will be blocked form GR posting.

      Thanks,

      Arijit