Change log activation for OKP1, OB52, FMIR, FMOPER, FMBOSTAT

zunaid_hingora2
Active Contributor
0 Kudos

Hi Experts,

Our client have a requirement of activating change for tcodes OKP1, OB52, FMIR, FMOPER, FMBOSTAT. Is this possible? If yes do we need to do any configuration or any other additional activity is required.

Please guide as how to achive this.

Regards

Zunaid

Accepted Solutions (0)

Answers (2)

Answers (2)

iklovski
Active Contributor
0 Kudos

Hi,

By default, these activities are already logged, unless your BASIS team switched them off deliberately.


Regards,


Eli

former_member198650
Active Contributor
0 Kudos

Hi Zunaid,

You have to activate change log at the table level for the respective t.codes. However, it is advisable that do not active this log. It will impact on system performance.

Regards,

Mukthar