Production Order Storage Location

Hi PP experts,

In production order, some storage locations is E004 (The old value is E004, but I have changed the value to E001 in BOM).

My question is: Why the storage location can not bring out as E001.

Could you please give me some advises? Thank you.

For example, item 0010, the storage location is still E004 in production order.

First, I checked the storage location in material master MRP2 view, the value is E001.

Second, I checked the storage location in BOM for this component, the value is E001.

Thirdly, I checked the supply area which the component is assigned in production order operation contains a work center with supply area. But the supply area is not maintained for this work center.

Regards,

Steve

02.png (22.9 kB)
BOM.jpg (166.1 kB)
4.png (17.9 kB)
Add a comment
10|10000 characters needed characters exceeded

Related questions

5 Answers

  • Best Answer
    Posted on Aug 25, 2015 at 11:34 AM

    Hello,

    Did you change the storage location after the production order was created ? If yes try CO02 -> Functions -> Read PP Master Data, and refresh the production order data.

    Please check the below thread and SAP note, 137225

    Storage location determination in Production order | SCN

    Best Regards,

    Ameya B.

    Add a comment
    10|10000 characters needed characters exceeded

    • Hello,

      You can get the production order creation date from the Administration tab.

      You can check the material master changes by going to MM03 and Environment -> Display Changes

      You can check the BOM changes by going to CS03 and Environment -> Change Documents

      Check if master data has been changed post production order creation and re read the PP master data, it should solve your problem.

      Best Regards,

      Ameya B.

  • Posted on Aug 25, 2015 at 11:40 AM

    Hello,

    You can use the Function-- Read PP master data if your order is in created or release status.

    Else short close this production order and create new production order and check the storage loacation of your components.

    Best Regards,

    Rupesh

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Aug 25, 2015 at 11:58 AM

    Hi Steve,

    This could be due to change in master data after creating production order.

    System copies data from material master, BOM , Routing, work center etc at the time of order creation. If you change any data (example Sloc as E001) in Material Master or BOM, it will not get updated in production order automatically.

    You need to change it using "Read PP master data" as mentioned by forum members. You can create a new production order and check if correct sloc is getting picked in new document.

    Regards,

    Rohit

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Aug 25, 2015 at 12:05 PM

    Hi steve

    after making change in the bom you have to into production order change mode.In the top of the screen you can get the function tab into which you can get the "Read PP master data".Just click on that....after doing this you can get an pop-up screen...it shows that the production order status going to change from "Rel" to "crtd"...It is only possible when you did not confirm the production Order.

    Regards

    Debraj

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Aug 25, 2015 at 02:19 PM

    Thanks everyone so much. 🤪

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.