Skip to Content
0
Former Member
Aug 24, 2015 at 11:19 AM

Mass change Task List Description?

1194 Views

Good morning people,

In our system, numerous materials have multiple routings, because it is possible to produce it on multiple production lines. We have now added a production line; now routings over production line X (using Workcenter 1X and Workcenter 2X) have been changed in routings over production line Y (using Workcenter 1Y and Workcenter 2Y). This I have been able to complete succesfully using CA85n.

However, in CA03, I encounter problems changing the Taks List Description. The task list description still displays "...... Line X", even though the routing is changed into a routing using Line Y. The "........" represent a product description, and therefore differs for each material.

This description of course can be changed using CA02, but I am trying to find a way with which I don't have to do this a thousand times manually.

Is there a way I can change this using a mass change or something?

I hope someone can help me,

Henri