Hi,
I need a small clarification.
I created one PR then with reference to the pr I posted One PO. Fine,
Now i delete the row at Po. and then I cancel the release of PR through the ME54N.
If I Cancel the PR Release, then Qty field at PR will be enabled i can able to change it.
But Material code i am not able to change it. May i know is there any possibility to change it.
Qty is still showing in OPen qty. How much i raised. Through the ME5A i checked it.
But Material code i am not able to change it at Purchase Requisition.
Is there any possibility please update me.