Assembly Scrap Calculation

Former Member
0 Kudos

Hi Guru's,

I have one FERT material with its BOM and Routing in place and i have maintain Scrap in operations in routing too, while i am trying to update the assembly scrap in Material Master with CA97N i am getting an Error Massage which says the followings:

Message no. CP276:No task list found for mat. XXXXX in plant 1000 with select. prof.02.

Kindly give ur expert comment for the same.

With Regards

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

Hi,

Check the Status of your Task List in 'Header Details' screen of Task List?

It should be '4' that is 'Released (general)'.


Check whether task list is active or Deletion flag set?


Also Check whether more than one task list is exist for your material?,  if so then in CA97N specify your inputs.


Regards,


Naresh


former_member196530
Active Contributor
0 Kudos

Hi ,

Please do the following

1. Compare the validity of the routing Key date and the date you are entering in CA97N

2.Check the Task List Type you have created in routing and  CA97N

3.Check the usage of the Routing and also status maintained in CA02

4.Please check whether you have marked Update with Assembly Scrap in Indicator Tab in CA97N

Regards

JH

RahulHanda
Active Contributor
0 Kudos

Hi

Have you put only key date & material number in selection criteria or anything else. Could you provide screen shots for what you are doing?

Regards

Rahul

Former Member
0 Kudos

Hi Rahul,

I have put Selection Date, Material and Plant.

With Regards

RahulHanda
Active Contributor
0 Kudos

HI

Then check for the validity of task list and key date/selection date selected in CA97n. The task list should be valid on this date.

Regards

Rahul

Former Member
0 Kudos

Hi Rahul,

Task List is valid upto 31.12.9999 and selection date is current date.

With Regards

rupesh_brahmankar3
Active Contributor
0 Kudos

Hello,

Change date used as a selection

Only the task lists valid on the key date and changed on or after the date entered are selected.

Please try by using the Key date instate of Selection date.


Best Regards,

R.Brahmankar

Former Member
0 Kudos

Hi Rupesh,

Thanks for your input, i have created routing for new material and is updating the scrap in material master,but while i am trying to update the scrap in material master again by changing  scrap% in routing nothing is happening.

Will it be done on periodic basis??

With Regards

former_member196530
Active Contributor
0 Kudos

http://scn.sap.com/docs/DOC-52834

Hi

Please read the both  wiki details on various scrap management in BOM , Components , Operation .Hope it will give you an idea

http://wiki.scn.sap.com/wiki/display/ERPLO/Scrap+Calculation

Regards

JH

rupesh_brahmankar3
Active Contributor
0 Kudos

Hello,

Did you select the update with assembly scrap indicator?

The scheduling results are updated in the material master with transaction CA97 or CA97N

An assembly scrap that is calculated during scheduling is updated.

Best Regards,

R.Brahmankar