Production(Planned) Key Figure Editable

Former Member
0 Kudos

Hi All,

In an capacity check planning how to make Production(Planned) Key Figure Editable when Product/PPM is selected/drilldown using a macro.

I am aware of ROW_INPUT Function with arguments "0" and "1" for edit/non edit.

However edit mode has to b triggered based on drill down(Product/PPM).

Could anyone throw some light on the same to achieve the functionality.

Thanks

Ramesh.

Accepted Solutions (0)

Answers (1)

Answers (1)

RahulHanda
Active Contributor
0 Kudos

Hi Ramesh

Try to create a macro as mentioned in below link. In the link it's on location and product combination but you can try the same with material and PPM.

I don't have system as of now so have not tried but you can try the same. Let us know if it helped and resolved your issue.

Regards

Rahul