Skip to Content
author's profile photo Former Member
Former Member

Refresh pre / post steps for Dev system in ChaRM

Hi Team,

We are planning a Dev system refresh from Production system. This Dev system is configured under ChaRM for CTS usage. Can you please guide the actins / steps i need to ensure during this refresh so that my existing cycles and changes are not impacted after the refresh.

BR, Alex

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

6 Answers

  • Posted on Aug 14, 2015 at 12:06 PM

    Hi,

    From:-Change Request Management scenario: Usual questions and known errors


    Please check from there.

    Regards

    Rishav

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Aug 19, 2015 at 04:54 AM

    Hi Alex

    Please let me know if your doubt got cleared.

    Thanks

    Rishav

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Aug 19, 2015 at 07:35 AM

    Hi Rishav,

    Thanks for your reply. I will follow the system copy steps mentioned in the link and get back to you after my refresh tasks incase any error

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Aug 25, 2015 at 01:02 PM

    Hi Rishav / All,

    I have completed my system refresh. now while creating a new TR under the project i get a message

    No project found

    Message no. CTSPRJ060

    Diagnosis

    When calling a function of the Change and Transport System, a reference was made to project XX_XXX_XXX in project system SAP_IMG_PS. There is no administrative data for this project in the Change and Transport System in this client.

    Please suggest.

    BR, Alex

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Aug 25, 2015 at 01:33 PM

    No Rishav, I am using the existing cycle that we were using before the refresh. Yes we have the entry in CTSPROJECT table. What i observe is no entry in spro_admin for that project.

    BR, Alex

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Aug 25, 2015 at 02:02 PM

    Unfortunately, we have not taken the spro backup. We only took table ctsproject backup.

    Add a comment
    10|10000 characters needed characters exceeded

    • Hi Alex

      If you have not closed the cycle also, then I guess there will be problem.

      first, if you will create the new img project also, then you need to attach the old transports to your new cts project manually.

      second if current cycle could have closed then it would be releif for you as you could have create the new ctsproject as now closing the cycle may stuck in error.

      I will suggest to raise it with SAP.

      Thanks

      Rishav

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.