raw material with price zero

Former Member
0 Kudos

Dear Experts,

     I have a raw material, we use it in many finished products we were use it without any problem but i had an info message in cost estimate that I have to set with quantity structure indicator for it so i set this indicator but after that when we consumed all the stock the raw material price became zero so I want to if this is because this indicator and if yes how can i solve this issue.

Note: material with average price.

Thanks

Ahmed Nassar

Accepted Solutions (0)

Answers (1)

Answers (1)

rajneesh_saxena
Active Contributor
0 Kudos

Hi

Not able to understand your query. Kindly re-frame with example/screen shots, so that we can extend help.

Rajneesh

Former Member
0 Kudos

dear Rajneesh thanks for your reply

my issue in brief that after I set the quantity structure indicator for raw material and we consumed all the stock of this material in production the material price became zero and before the last issue this material had price.

thanks

Nassar

rajneesh_saxena
Active Contributor
0 Kudos

Hi

I assume that your RMs are having price control 'V'. You can have 'planned price' option in your valuation variant for material valuation as a last option. In the cases referred above you need to maintain planned price manually in the material masters with effective date. In this way, at the time of std cost calculations system will pick price of material from that field of material master.

Moreover, quantity structure indicator has nothing to do with the problem you are facing. Quantity structure only refers to the BOM and routing associated with your material.

Regards

Rajneesh

former_member198650
Active Contributor
0 Kudos

Hi Ahmed,

System wont make the price as 0 when you consumed whole stock of the material. System will show last price of the material. So check once again.