on 01-31-2006 11:09 PM
Whenever I try to load data into BW from R/3 system by starting the job for full load, I see the error in the R/3 system (WE02) which is "Incomplete control parameter for commmunication with the BW system". Does anybody have clue on this problem?
Thanks
RR
RG
Welcome to SDN
It seems your source system to BW is not connected properly. First step is
Go to the source system right click and select the check. It gives error if the connection is not setup properly.
Thanks
Sat
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
86 | |
10 | |
10 | |
9 | |
7 | |
7 | |
6 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.