Skip to Content

Desecrate Manufacturing vs. Repetitive Manufacturing

Dear Expert.

Could you give light on WIP calculation in Desecrate Manufacturing vs. Repetitive Manufacturing.

In Desecrate Manufacturing (Product cost by Order).

Suppose we creating 100 No. of Order & we Confirm 90 No. then 10 No. (100-90) is our WIP it is calculating & it i understood, but

In Repetitive Manufacturing (Product cost by Period).

I can't understand WIP calculation, because there is no order in Repetitive Scenario. In Repetitive Scenario we run Product Cost Collector (KKF6N) & their after we confirm through MFBF.

Please tell the WIP calculation part with example.

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Posted on Jul 24, 2015 at 07:49 AM

    Hi Debasish

    1. In Discrete Manufacturing we are going by Prod Ord by lot and WIP is calculating based on actual cost posted in Order irrespective of delivery qty..if GR is not made total actual debit value will be WIP...if GR is made then difference of Actual Debit and credit will be WIP

    2. In Repetitive manufacturing WIP is calculated based in target cost of actual qty delivered ie on GR qty.. Target cost will be generated based on delivered qty..so difference between Actual debit and Target cost of delivery qty will be WIP

    kamal

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.