cancel
Showing results for 
Search instead for 
Did you mean: 

Product Compliance on CE6.0 and SPRC 2.0

former_member214272
Contributor
0 Kudos

I'm afraid, but I have very basic question about Product Compliance. We can find Product Compliance application in both place CE6.0 and SPRC 2.0. Both application are design for discrete Manufacturers to support Environmental Compliance REACH - SVHC and RoSH  and managing IMDS Compliance

SPRC 2.0 - Product Compliance

http://help.sap.com/saphelp_rc20sp02/helpdata/en/3d/430e01d32d47328c10f9f1e0cd3389/content.htm?frame...

Product Compliance CE6.0

http://help.sap.com/saphelp_ehsext60/helpdata/en/cd/00754eb792490ebc9b48255f32161d/content.htm?frame...

Question:  What is significant difference between these  Product Compliance ? Since access Product compliance are different in both the case.

If both Product Compliance application is having same objective to cater compliance requirement for discrete Manufactures why they are available in different place and which one should we suggest clients? 

Thanks

Sunil 

Accepted Solutions (0)

Answers (1)

Answers (1)

ulf_petzel
Advisor
Advisor
0 Kudos

Hi,

SPRC 2.0 is a predecessor of the EH&S Management Add-On. Also, its focus at the time were primarily the Process Industry requirements around REACH.

For Discrete Industries clients, the EH&S Management Add-On, potentially tied into SAP Product Stewardship Network, should be positioned.

Ulf.

former_member214272
Contributor
0 Kudos

Thank you for clarification

If we want to conclude, Shall we say that -  "Process Industry compliance requirement get address by SPRC2.0 and Discrete Industries should go for EHSM CE.6.0 to fulfill there Compliance requirements"

It would be great if you can share/ suggest any SAP document / Link  where we can do apple to apple comparison between two.

Thanks

ulf_petzel
Advisor
Advisor
0 Kudos

Hi,

if you want to conclude - anyone, both Process and Discrete, should go with latest EHSM Add-On to fulfill the product compliance requirements.

As said, SPRC 2.0 is a predecessor. It was in GA 16.08.2010. It should NOT be implemented. There is no apple to apple comparison needed.


Please make sure to mark the question as Answered.

Ulf.

christoph_bergemann
Active Contributor
0 Kudos

Dear Sunil

I am sorry. It is not as "easy" as you might believe. There is no clear answer possible to your question. But this document might help you getting better understanding about the "facts" and the potential future:

C.B.

christoph_bergemann
Active Contributor
0 Kudos

Dear all

only small add on:

the term "SPRC 2.0 is a predecessor of the EH&S Management Add-On" is not a good one.

The "Component Extension of SAP EHS MAnagement " can not ! take care all of the many processes existing in SPRC 2.0; only some aspects have been transferred from one solution to the other. Currently i would assume that no additional transfer is planned. as SAP will concentrate on S/4 HANA roadmap.

On the top: the "Component Extension" is based on completely different data model, Userinterface etc.

With version 6.0 once again some redesign has been done and thes solution can now support on top processes (and therefore the old SAP solutions can be removed/transferred to new solution)

Please check the Online help

C.B.