on 07-09-2015 1:29 PM
Dear All ,
I am getting an error during the creation of WBS through BAPI
Our Project Profile have Only one root Indicator set. Error comes on those cases where already Multiple WBS are exist on level 1 and then if we try to create NewWBS through BAPI.
BAPI is sending the response in error that Several WBS elements on level 1 is not allowed Message No CJ719
This is only the information message if new WBS create directly through CJ02 but BAPI is sending this message as an error.
Request you to please help in this matter.
Let me know if any more information is required on this.
Regards
Amit Shrivastava
Thanks Sammer ,
Agreed on your point , I will raise the OSS for this.
Regards
Amit Shrivastava
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Sammar/Suni,
Thanks for your input ,
I had already checked with Business and they don't have idea on this why this changes was done so i have already unticked the only one root check in profile for resolving this issue.
actually there was technical upgrade happened to EHP7 and after go live of this changes , BAPI is sending this information as an error before that no such cases reported even the profile have only one root indicator set.
So this is due to Upgrade and if yes then is there any solution to do the correction on this.
Regards
Amit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Sunil ,
You are right system will not allow to create WBS at Level 1 if only one root indicator is set in profile but these are the case where project have already multiple WBS at level 1 and as per process system allowed to create WBS at 2nd or 3rd level by only giving Information message.
My question here is system allowed me to save the same through project builder but not through BAPI.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Amit,
One Root indicator is used where you have only 1 WBS as Level1 WBS within a project.
system will not allow to create another level1 WBS with in same project.
There can only be one top WBS element
thanks
Sunil
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
95 | |
11 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.