on 07-08-2015 1:59 PM
Dear Experts,
We are in starting stage of implementing Nakia in our landscape.
As part of ECC EHP7 upgrade we have installed Nakisa 410_740_RF, but when i add the transport files into ECC. the status of transport request is as below screen shot. (TR status is Does not match the component version).
as per guide, i already referred to VSN4.1 Environment checklist, all the required components already installed in the ECC system.
Please suggest some info on this to proceed further.
By the way, do we need to activate business function HCM_TMC_CI_1 before the transport import or after the transport import ? since when i tried activating the Business fucntion, its not getting activated with message (No Activation Necessary).
Thanks
Ahmed
You can proceed forward by ignoring invalid component version message.
This feature (check the component version) was included with SAP_BASIS 702, so the TP checks the component version of the system where the transport was released (this information is included in the transport) and the component version of the system where the transport is going to be imported. And in most cases the two systems are different, hence the warning message.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Shahbaz,
Thanks for your reply.
activating business function HCM_TMC_CI_1 before the transport import or after the transport import ?
since when i tried activating the Business function, i was getting message No activation necessary.
But in the Naksia Transport installation document, it is mentioned that BF activation required.
Thanks
Ahmed Shafir