on 07-07-2015 10:04 AM
Hello,
Without change number it is not possible in standard SAP.
Best Regards,
R.Brahmankar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello,
By using change number you can change valid-from date not Valid to date.
Workaround example Create a change number using CC01 ,having the valid from date as 01.07.2015 and make the changes in recipe
2.Create another separate change number using CC01,having the valid from date as 01.08.2015 and add the phase/operation in recipe
In that case you can view the valid from date as 01.07.2015 to 31.07.2015 .
Please refer,
and KBA 1644885 - Explanation of BOM Validity Date
Best Regards,
R.Brahmanka
thanks Brahmankar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
Please implement ECM functionality with Change Number Record for MR where you can change the Valid From Date based on the Change number validity date and status active .
To activate ECN for Master recipe u need to set the Following
1) In OPN0 - Default values for Master recipe choose the Profile with which u want to create the Master recipe and Click on details > In the Change Parameters at bottom select "with Change Number" for Change Rule and SAVE
2) In OP5A - Select the Screen Group PP/PI/QM task lists: header screens and tick *Req * for the field Change Number (PLKOD-AENNR) and SAVE
Apart from that in configuration , you need the following -
This are the basic IMG settings in order to used the
engineering change management features.
x refers to a tick.
First setup the control
data in OS54.
Revision sections
Fields :-
Revision
level active x
Ext. revision level x
Higher
revision level x
Object Management
Record sections
Fields :-
Object
maintenance x
Assign alternative date
x
Overide value/assignment date
sections
Fields :-
Only with leading change mst.
x
Setting the Revision level active is to activate the engineering change
management for material master. If you do not want the engineering change
management for materials, remove the tick.
With a tick in "Higher
revision level", the new revision level has to be always higher than the old
revision.
Secondly, setup the external number range in OS53.
If you use the internal number range, then
remove the external number range.
Third, define the status for the change
master records in transaction SM30 - V_T419S.
Change No. Chg Date Chg Dist. Lock
Description
Status Poss
1
x x ' ' Active
2 ' ' ' ' ' '
Inactive
3 ' ' ' '
x Locked
Fourth, define modification parameters for the
BOM in OS27.
Fields
:-
BOM Validty Maint. x
EC Management Active
x
History Requirement ' '
Unit
Piece PC
The rest of the fields are
blank.
If the History Requirement is tick, every time during creation of the
BOM, SAP willprompt your for an ECN number as is compulsory.
Lastly,
define fields selection for routing in OP5A.
Regards
JH
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Navneet,
As far as I know without change number this is not possible.
BR
KK
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
100 | |
11 | |
10 | |
6 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.