Hi Experts,

We have lots of capacity flexibility at production plant like if one reactor is free then one product can be manufactured in other reactor also. This changes are happening very often.

So in APO can system automatically make capacity levelling and planning ?

Regards

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

3 Answers

  • Jul 06, 2015 at 06:01 AM

    Hello Sunriser,

    There is no function of automatic capacity leveling and planning, you have to run the planning engine like Heuristic, optimizer etc on it. You can manually schedule it or you can take the planing run in background so that system automatically make capacity levelling and planning Run capacity leveling to produce a feasible plan.

    Please refer this useful help link,

    Standard Functions in the Production Planning Run - Automated Production Planning and Optimization - SAP Library

    Executing the Production Planning Run in the Background - Automated Production Planning and Optimization - SAP Library

    Best Regards,

    R.Brahmankar

    Add comment
    10|10000 characters needed characters exceeded

  • Jul 06, 2015 at 08:13 AM

    Hi

    Your capacity requirement is generated on the basis of demand elements and to have feasible plan you need to opt for right planning engine considering business requirements example heuristic, CTM, optimizer, etc. Thereafter you either need to carry out this manually or define background job. Check below for reference:

    SNP - Capacity Leveling in SCM 5.0

    Capacity Leveling - Supply Network Planning Run - SAP Library

    Regards

    Rahul

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Jul 06, 2015 at 01:49 PM

    Hello Sun,

    Where are you doing the changes? However look after STRATEGY button. Be sure that the strategy setup is FINITE mode. Then, when you will do some changes the capacity will be taken in consideration. So, no needed to do the leveling! The sequence can be made manually or through an heuristic that should be available in the transaction!

    Thanks,

    Regards, Marius