Skip to Content
0
Jul 04, 2015 at 07:08 AM

Routing selection for same material

120 Views

Hi PP experts,

We have a common sub assembly use for different Fert material. But our actual production for different fert is on a different line area in the workshop. So means for the same sub assembly the bom is same but the Routing is different and work center is different. We want to know is there a method that can support us automatic select the right routing during MRP run and create the right production order with right routing and then we can check capacity load with CM01.


Could you please give me some advises? Thank you.


Regards,

Steve