on 06-21-2015 5:17 PM
Dear experts,
would need to update the percentage obtained in cost distribution into a Discount Charge type. Can someone tell me which Badi or enhancement I can use to write a percentage into a Charge type ? The charge type shall contain the share amount from cost distribution.
Has someone used an enhancement to write an amount into a Charge type that does not come from a rate table?
The only idea I have would be to use a CHACO method and read the amount from the cost Distribution node and copy it into the pricing node.
Is there a dedicated Charge calc Badi to do that? I would like to Show the percentage in the calculation rules shown in Show/Hide Details.
Regards
Petra
Hi experts, in the meantime, I have found out where this can be done, so I am posting it here.
use standard method /SCMTMS/CL_TCC_ENGINE and create a z-class. Method "process calculation sheet can be used.
hope it helps
Petra
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
8 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.