Skip to Content
0
Jun 19, 2015 at 11:01 PM

No HUs have been transferred for material

450 Views

Need help with the following issue :Packing in VL02n

TO was confirmed and then on the time of PGI. Handling unit was deleted without performing "unpack". Now unable to repack it to perform PGI, probably because the HU which was created while TO confirmation is deleted and also the material in lower "materials to be packed" window is greyed out. i cannot select it.How can i repack and perform PGI ? i have to use the same delivery number, cannot recreate it.