cancel
Showing results for 
Search instead for 
Did you mean: 

Stock posting Without UD

former_member1362799
Participant
0 Kudos

Hi Expertise,

Please suggest me for:

I want to transfer stock posting without UD for a specific material Group.how can i do it ?? what configuration and settings are required for this?

Thanks & Regards,

Vivek Bhojak

Accepted Solutions (0)

Answers (2)

Answers (2)

former_member193808
Active Contributor
0 Kudos

Dear Vivek,

You can do this from inspection lot UD directly.

Go to QA11 and go to "Inspection lot stock" tab. There you can see the quality stock. You can enter the required quantity to be released and save the transaction, without entering any UD details.

This way, the inspection will remain but stock can be released.

Thanks

Prem

former_member1362799
Participant
0 Kudos

Hi Prem,

thanks for reply.

I have checked this thing already but in this case i am getting an information message " Please enter valuation code" please suggest me where is it maintained or how can i remove it?

BR,

Vivek

former_member192897
Active Contributor
0 Kudos

Why do you want to skip Usage decision? It seems, Usage Decision is made mandatory in your case. Can you check the message number and description and let us know.

You said, your requirement is to skip Usage decision for a certain Material group? Do you perform Stock posting in this case directly skipping UD code?

Could you elaborate your requirement.

If the Usage decision and Stock posting is not required for a set of Material, but you want to do the results recording, you can untick the Post to Inspection check box from Material Master Quality Management view. By doing so, Stock directly goes to the Unrestricted stock. You can then perform the results recording for the Inspection lot.

former_member1362799
Participant
0 Kudos

Hi Ashok,

My scenario is :

I have inspection lot of 100 qty. for a specific material group (its QC will take 14 days) there i take a sample ,suppose 10 qty.so i want to transfer remaining 90 qty. to another plant with restricted status.

so for this purpose i am thinking:

If i transfer this stock without UD in QA11.so,i can meet my requirement and after 14 days i will complete the UD.but in QA11 UD is mandatory there message is " Please set Valuation code " message no. QV997 please,suggest me how should i map this scenario?

BR,

Vivek

former_member42743
Active Contributor
0 Kudos

I think this is related to split valuation but I'm not sure.  Are your materials set up for split valuation?  Your MM person should be able to tell you that.

Craig

former_member193808
Active Contributor
0 Kudos

Dear Vivek,

If you are holding the stock till quality is released, then why can't you have a material transfer inspection / STO inspection at destination plant?

Is there any specific requirement to hold the stock in Quality in source plant? You can release the stock in source plant, transfer it to destination (receive to QA stock).

Currently you are trying to transfer a Quality inspection lot stock from one plant to another plant, without releasing quality. that's the valuation code (UD Code) error you are getting.

Thanks

Prem

former_member42743
Active Contributor
0 Kudos

UD's are not required to do stock postings from an inspection lot in standard SAP. It's only if you have implemented a user exit or a status profile to require such.

So I don't think that error message is driectly related to the UD valuation.

But you bring up a good point.  Does this stock even need to go to QI if they transfer it routinely.  The question would be if this is a one-off event, or if all the material is always transferred all the time.

Craig

former_member1362799
Participant
0 Kudos

Hi Prem,

As i told you ,this material takes 14 days in QC process and after that if i deliver to another plant then its take 2 or 3 days in transportation due to this reason get the delay so,client wants to take risk and deliver from 1 plant to another plant with batch restricted status.So,1st i am trying to post the stock with restricted status without completing UD and then will transfer plant to plant in restriction status.

after 14 days will complete UD and move the stock from restricted to unrestricted.

If i have cleared my requirement,then suggest me best way for this.

This is required for a specific material group so, will be required stock posting without UD only for a particular material group.please suggest me what should i do in this case?

BR,

Vivek

anand_rao3
Active Contributor
0 Kudos

Why don't you activate inspection at the plant where you will be receiving the goods? It will fall again in the QI of that plant. In one sense you would be restricting the use unless someone clears it from QI to unrestricted. How the UD of plant A can play role in restricting the use in Plant B?? I am not sure if you can deliver the batch with Restricted status or can perform any movement unless it is in usable status.


I would go with below sequence for this requirement.

  1. Goods Receipt in Plant A - Gets posted to QI with inspection lot generation
  2. You clear this inspection lot and post the stock in to UU and give UD. - This could take 14 days
  3. Once the batch is in UU (irrespective of UD or days of inspection) it can be sent to any other plant.
  4. Then you create STO process orders and consume the material to this order. The moment you do this, the stock from MMBE will be seen as stock in transit
  5. Then you inward the material in to Plant B where you have activated QM.
  6. It will thus fall in to QI of plant B. Then you inspect as per your set criteria there.
  7. You need to check with which movement type the MM person is inwarding the material in Plant B.  Mostly it would be 101. Activate QM for that movement type in OMJJ.

Anand

former_member42743
Active Contributor
0 Kudos

You can accomplish this in many ways actually.

Process 1 - just post all stock to UR instead of QI and ship as you normally would. (I.e. untick the "Post to QI stock" in the material master inspection type setup.  Do all stock movements like you normally would.

Process 2 - post stock to QI and create an inspection lot. Set up your batch management to create your batches as restricted.  Once a lot is created, post the sample stock on sample line and the qty to unrestricted on unrestricted line.  This should result in your stock as unrestricted with restricted batch status.  This can be shipped on a Stock Transport Order to the other plant but can't be sold.  When the UD is done, the UD code can be set up to change the batch status to released.  Only works if your at the material or client batch level.

Process 3 - use long term inspection characteristics in your inspection lots.  Make a UD on lot with a UD code "OK to ship".  Material posted to UR and shipped.  Record results on long term characteristics, change UD to "A".  This won't prevent sale of material when it gets to second plant.

There are several possible variations of the above processes as well.

My personal preference is #2.

Craig

former_member1362799
Participant
0 Kudos

Hi Craig,

Thanks for your reply.

Can you help me,that exactly from which settings or customization i am getting this message " Please set valuation code" Message no. QV997 it is a standard message.there i have checked all possibilities like Status Profile maintaining even there is no user exit.

And what is the use of Usage Indicator in QS41?


BR,

Vivek

0 Kudos

Hi Vivek,

Check below thread.

Best Regards.

Tushar Parmar

arunsapqm
Participant
0 Kudos

Hi,

Pls check this link ,Transfer Posting 321 without UD | SCN.

thanks in advance

former_member1362799
Participant
0 Kudos

Hi Arun,

I have checked this link already,but when i am going to transfer stock posting with MB1B-321 Mov .type then getting error "

Change the inspection stock of material in QM only".

and in OMJJ i ticked flag of QM not activate also,but result is same.So, what should i do?

BR,

Vivek

arunsapqm
Participant
0 Kudos

HI vivek,

In material master QM view,click Insp.set up Tab & deactive the Flag Post to Inspection stock.

Note :before change material master settings,stock should be  zero.

thanks