Hi All,

Just want to ask if there is a user exit or BADI that would generate PR from work order at operation level regardless of how many material were inputted with item category N at component tab?

Thanks!

Ken

Accepted Solutions (0)

Answers (2)

Answers (2)

jogeswararao_kavala
Active Contributor
0 Kudos

Hello Ken,

I'm not sure, but you may have a look at these 2 user-exits COZF0001 and COZF0002. Also keep handy this page for such search. PM-CS User Exits compiled by Pete Atkin.


KJogeswaraRao

rakesh_mane
Active Contributor
0 Kudos

Hello

Please use Control Key PM03 or PM04 or External process Control Key at operation level

Br

Rakesh