on 06-01-2015 1:13 PM
Dear all,
Here I am having an issue while creating DP91 and subsequently simulating for Debit Memo. I created a contract and maintained the plant (I am not maintaining the plant in Material, Customer or CMIR). After doing subsequent process CAT2, Approval, CAT5, ow I go to DP91, but system is not copying the plant from preceding document and pricing is also not determining according. If I simulate for Debit Memo, in line item shipping tab, plant is not copying. Can anyone tell me what is the issue? I am attaching the screen shot here.
And after simulating the Sales & Distribution document, plant is missing. Plant should come from Contract itself.
Regards
Abhishek
Hi Abhishek,
For pricing, did you maintain condition record for ZPR1 in tode VK11?
Second. system is not able to determine the plant as you have not maintained any where?
Pls check copy control for Contact to DMR(VTAA).
Thanks.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Abhishek,
Can you please confirm, whether the DP91 ( debit memo request) is populated with Dynamic Item or Material from Contract?
thanks
santosh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Abhishek,
Transaction flow for RRB is VA41 (Create contract)-CJ01 (Create Project/WBS element)-CJ02 (Release WBS element)-DP91 (Create Billing request)-VF44 (Post revenue recognition) - VF01 (Create Invoice).
Please refer,
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi'
Sorry to spam this thread, but can you explain to me how to use Revenue Recognition proces together wit RRB in this way:
1) Create contract with customer with material relevant for RRB. PS-project is created using assembly processing. (we can do this today)
2) Customer get down payment invoice (we should put the value as "asset" - not revenue)
I assume we can do this - but Im not sure we use the correct standard way.
3) As CATS-confirmations are made at the PS-project we use DP91 to create order and should reduce the "asset-amount" and increase the revenue
As far as I understand, this is the Revenue Recognition-proces and should be able to make the correct postings?!
Thank you very much in advance!
Br
Lone
User | Count |
---|---|
102 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.