Skip to Content
avatar image
Former Member

No WWI dispatch for EHS WWI CG54 DOKX_EXOMN

Hello,

When I'm using the CG54/EXPORT transaction (standard user exit DOKX_EXOMN), all the export process is ok except there is no dispatch between the available WWI servers (3). I get the final report extraction (+ key file) in the target path.

But as I'm doing a mass extraction with CG54 the whole process is taking a while because all the report extraction is sent to a single WWI physical server.

We have 3 WWI installations up and running (3 physical servers - 6 virtual servers available), and when we start any mass report generation
with CG02 transaction, then the WWI dispatch is effective.

Can you please tell us if the absence of WWI dispatch with the CG54/Export transaction is a normal behavior or not. If not, what could causes this behavior?

Thank you,
Eric MOENS

Add comment
10|10000 characters needed characters exceeded

  • Follow
  • Get RSS Feed

1 Answer

  • Jun 01, 2015 at 10:54 AM

    Dear Eric

    in most cases the "dispatching" of WWi reports using the available asynchronous WWI servers is not linked to a "process" (e.g. in this case EXP_CALL). BUT

    If you dig deeper in WWI customizting and how the "distribution" process can be "optimized" you will find an option to "optimize" WWI "dispatching"; therefore one reason of this "strange" behaviour might be that there is an "implementation" done, If now this implementation looks like: if EXP_CALL and "parameter X = true) then use "only" WWi server "Z" this "strange" behaviour is coming up. In this case your "customs" code "overwrites" the normal distribution process of WWI handlin

    Check may be: Check WWI Destinations and Assign Generation Server - Product Safety - SAP Library etc. This "special" WWI set up is part of the "SDS distribution custimizing"

    Take a look here: https://www.consolut.com/en/s/sap-ides-access/d/s/doc/YY-EHS_SR_225_51 and the use of this "special" enhancement (To be able to assign a WWI destination and therefore the relevant generation server to the current generation job, you can use the SAP enhancement C12K0001.)

    May be check as well:

    Managing WWI report generation | SCN

    C.B.

    PPS:

    check as well:

    https://www.consolut.com/en/s/sap-ides-access/d/s/doc/YY-EHS_SRE_IMP_120

    As we do not use this process: there might be the option to "specify" a WWI server; if so clearly no "dispatching" is done any more and the only this one server is used to do the job.

    Add comment
    10|10000 characters needed characters exceeded