Message no. CK239

Diagnosis

The system attempted to generate the cost component split for the material, but discovered that no assignment has been made in cost component structure TS for cost element 99900001 and possibly for origin group .

System Response

The cost component split is incomplete. The cost of goods manufactured in the cost component split is therefore less than in the itemization.

Procedure

Go into Customizing for Product Cost Controlling and carry out the assignment for cost component structure TS and chart of accounts TSIL.

Hello Guys,
I am facing this issue while doing product cost collector in KKF6N. Actually this cost element(99900001) was previously assigned with cost component structure in OKTZ. But after we created new activity types and new secondary cost element(99900011) we just removed the above cost element (99900001) from the cost component structure and assigned the new secondary cost element(99900011) in that place. But when we are doing product cost collector the issue is coming and it is saying to assign this cost element in OKTZ.
So please help me how to resolve the above issue because we don’t want to use the above cost element as we have already assigned a new secondary cost element in that place.

Regards,
Shreekumar
Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

2 Answers

  • avatar image
    Former Member
    Feb 23, 2017 at 07:05 PM

    SAP Note : 2169907

    Firstly run the MLCCS_RESET program and then run the program MLCCS_STARTUP

    Add comment
    10|10000 characters needed characters exceeded

  • Feb 24, 2017 at 01:59 PM

    If your OKTZ and OKKN settings are correct, please, check OSS note

    2123151 - Collective Note: Problems with Cost Component Split in Price Calculation, Material Ledger, Product Costing and Reporting

    Add comment