SNP heuristics double generated prodtion order for subcontractor,why?

Material  A purchase type was 'F' ,and changed to 'E'(product) by user,L/T was changed to '0' too.

then transfer material master/BOM/routing to APO.

In APO,PDS was generated before material master updated.(purchase type,L/T)

after SNP heuristics,plan order was generated according to requirement,but other plan order was generated in the next day.

so there are double plan order for the same requirement.

Why?Does it because material's purchase type was updated from 'F' to 'E',so when heuristics was Triggered?

Need you help.Thank you~

pastedImage_0.png (260.7 kB)
Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

3 Answers

  • Best Answer
    avatar image
    Former Member
    May 27, 2015 at 08:36 AM

    Hi Rahul

    sorry for my description.

    The problem is,material changed  from 'F' to 'E' was 5/20,after update APO master,then run SNP heuristics to generate plan order according to production demand at the same day(5/20).

    But next day,SNP heuristics run and generated double plan order according to the same production demand.

    so double plan order(production order) were generated.

    Add comment
    10|10000 characters needed characters exceeded

  • May 27, 2015 at 08:24 AM

    Hi Yuan,

    Could you explain why you convert purchase requisition to production order, when procurement type was F. As you have mentioned the changes were done on 20th May but were not shifted and that day's run should have generated PR instead of planned order. So PR should have been converted to purchase order instead of production order.

    So how and why it was converted to production order? Are you using any conversion rule with some badi in product master?

    Plus are you sure that demand has not increased, coz for certain lines the target quantity is not same which could be because of demand increase. Please cross check.

    Regards

    Rahul

    Add comment
    10|10000 characters needed characters exceeded

  • May 27, 2015 at 08:37 AM

    Hello YUan,

    Do you see them in SNP Planning book or RRP3 view as double?

    Please run the CCR report and check if any inconsistency in APO and R3 for planned orders.

    Also you can delete these planned orders and rerun the heuristic and check the results.

    Best Regards,

    R.Brahmankar

    Add comment
    10|10000 characters needed characters exceeded

    • Hello Yuan,

      You have already close this discussion

      This question has been Answered.

      Please check OSS note  2051531 - SNP location heuristic creates duplicate orders

      if valid for your release.

      Best Regards,

      R.Brahmankar