on 05-21-2015 5:08 PM
Hi all,
I`ve a problem in SXI_CACHE with a BPM. Im looking it with status 0 (correct), but the references with ESR (name, namespace and SWC)are empty.
I tried to refresh cache, to reimport this BPM in ID, to re-actívate this BPM in ESR, but the behaviors is the same, keep empty.
Any idea?
Thanks in advance.
The problem is that I transport all objects again (in other enviroment dont have errors), and my bpm in sxi_cache shows 1 as return code....this isnt activated.
Basis team tried to actívate it, but system shows that the BPM has errors.....but.....its the same BPM in all enviroments! I dont know what to do.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
How to Handle XPI Caches in SAP NetWeaver 2004s (NW7.0)
Plz check the below links..
http://scn.sap.com/docs/DOC-16146
Integration Process is not displaying in SXI_CACHE | SCN
...
Mutti
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Are you talking about ccBPM on dual stack PI or BPM on single stack PI?
Concepts - Process Orchestration - SAP Library
As per single instance instalation (SAP PO), you won't be able to see them in ESR or ID. It is completely separate component. Refer the diagram in above link.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
78 | |
10 | |
9 | |
7 | |
6 | |
6 | |
5 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.