Skip to Content
avatar image
Former Member

GR Mode control at Business system Level


Dear All

We have requirement to have immediate GR postings for some warehouses and for other warehouses GR at the end of putaway process( Switch 1).

Since this GR mode control is at Business system level , is there a possibility of having 2 different business systems for differnt warehouses.

regards

Saravana

Add comment
10|10000 characters needed characters exceeded

  • Follow
  • Get RSS Feed

2 Answers

  • May 20, 2015 at 04:55 AM

    Hello Saravana,

    Maintain settings as below.

    Create two Business System here.

    Then do, Map your warehouse numbers from ERP System to EWM with separate business system each.

    After that, you can maintain your control Parameters for ERP Version Control at Business System Level.

    This should solve your problem.

    Regards,

    Sathish


    1.png (9.9 kB)
    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    May 22, 2015 at 02:58 AM

    Hi Durai,

    You can create two business systems then map your warehouses from ERP to EWM with different BS. Then you can control by Set up Control Parameters for ERP version Control.

    Thanks

    Anoop

    Add comment
    10|10000 characters needed characters exceeded

    • Serhan Er Sathish Kumar Bachu

      Hello Sathish,

      This is probably caused by commit work. Commit is only triggered when you press save button, only then you can pass db checks.

      Happens to me all the time 😊

      Best regards

      Serhan