Gap between preprocessing phase and system downtime

Hi Experts,

I have completed preprocessing phase on SCM 7.0 EHP3 upgrade(nZDM) in production system and now there are 5 more days to go for execution phase ( downtime).. since the system is in running status to the users in between and shadow instance has been created now..what should do I have monitor in the system daily before to go for the execution phase

I would appreciate your inputs and any relevant documents.

Thanks in advance

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    Posted on May 18, 2015 at 01:43 PM

    Hi Daniel ,

    Make sure that you have a backup of all the Filesystem ( Including the SUM directory , Profiles and the Kernel )

    Is there a change management freeze ? Ensure the transport system is freezed ( If possible ) , No new transports should be imported into the system [ Unless and until is is an Emergency transport ]

    Make sure that any changes to OS or DB , including SAPGUI is not done which is not planned .

    Other than that all BASIS regular checks like SM21, ST22 , Performance etc should suffice .

    Thanks ,

    Manu

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.