cancel
Showing results for 
Search instead for 
Did you mean: 

Consumption of a material with split valuation

Former Member
0 Kudos

Hi experts,

Imagine that I have a material with the split valuation with stock in both splits.

Is it possible to do a consumption of this material without specifying a specific split.

Ex. Material A with split C1 with 10 KG of stock and split C2 with 20 KG. If I do a consumption of material A with quantity 2 Kg, the final stock should be C1 - 9Kg and C2 - 19kg.

Thanks for help.

Accepted Solutions (1)

Accepted Solutions (1)

0 Kudos

Hi Pedro,

We can acheive this thru stock determination. We need to define stock determination strategy and assign this to stock determination group. And this Stck Det grp is assigned to the material master of A above. We need to also assing the stock determination strategy to movement type basically in above case it will be 261 I suppose. But please refer below write up which will give indepth details about what I talked above

Stock Determination - Inventory Management and Physical Inventory (MM-IM) - SAP Library

http://wiki.scn.sap.com/wiki/display/ERPSCM/Stock+and+Batch+Determination

BR

Raghava

Former Member
0 Kudos

Hi Raghava

Thanks a lot for you answer.

Answers (0)