Target Cost in the Cost Split-KSS2-Maintenance Order

Dears

We are doing the periodical activity in the Maintenance Order Settlement.

We did the actual cost split using the Transaction KSS2 and got the following results.

From the results, I understood that the control costs are the actual cost postings in the Cost Centre.

But what is the Target Costs mean here ? I was not able to understand how system has calculated it.

Capture.PNG (11.5 kB)
Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

2 Answers

  • Posted on May 13, 2015 at 05:36 AM

    Hi Nikki

    Target cost is the cost equivalent to Act activity qty * plan price

    kamal

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on May 13, 2015 at 05:53 PM

    Check the below link this will give you clarity on the Target cost and how it is calculated in KSS2:

    Actual Cost Splitting - Period-End Closing (CO-OM-CCA) - SAP Library

    Regards

    Giri

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.