Dear Guru's,

When doing the goods movement in the process confirmation (CORK) and using batch determination I can see the available stock.
However, in the material master the availability check is set to "ZZ" which means "no availability check".

How can it be that I see the available stock in the batch determination of the process confirmation when availibility check is turned off?

Even if I put the availability check to "KP - No Check" it shows me the quantities...

I am asking this because when using batch determination in the delivery, I get infinite quantity because of the availability check being turned off. When I change the availability check to "CH - Batches", then I am able to see the right quantities but I am not able to create Process Orders and Sales Orders if stock is not there (client requires that they need to do it even if stock is not there).

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    Posted on May 13, 2015 at 06:16 AM

    Hello Marco,

    For a confirmation, the batches used are already known because they were already processed for the order. NO availability check is supported during confirmation In Customizing for the availability check (transaction OMCP), the system does not propose any confirmation transactions like CORK under 'Transactions', therefore no checking rule can be assigned.

    This means that the system always displays all free batches .

    Refer OSS note 619911 - FAQ: Batch determination.


    Also note determination of Availability check with the combination of Availability checking rule + Checking group OPJJ in which check whether "Check w/o RLT" indicator has marked.

    Items for which the delivery date falls within the replenishment lead time, but for which there is no inventory, are confirmed for delivery after the replenishment lead time. In the case of items for which the delivery date falls after the end of the replenishment lead time, the system assumes that everything can be confirmed.


    Best Regards,

    R.Brahmankar

    Add a comment
    10|10000 characters needed characters exceeded

    • Hello Maro,

      This is not possible in standard SAP without availability check for batches.


      Also for more information on it please refer OSS note 619911

      Why do batches have an infinite available quantity (9 999 999 999) on the selection screen of batch determination?

      Answer

      It is a 'normal' system behavior when the availability is checked with the replenishment lead time and when the requirement date of the material falls after the end of the replenishment lead time. You cannot set the availability so that the system checks with the replenishment lead time at material level but without the replenishment lead time at batch level. For materials that are subject to batch management requirements, check the availability without including the replenishment lead time.

      Best Regards,

      R.Brahmankar

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.