cancel
Showing results for 
Search instead for 
Did you mean: 

partial rejection of Quality stock from production ?

maheshkumar_komatineni
Active Participant
0 Kudos

Hi Gurus,

can nay body let me know how to reject partial quantity of the Quality stock which is received from production.

EX : i have activated inspection type 04 for a FG material after Confirmation Stock is getting posted as quality stock . i am processing  the INSP lot and posting into unrestricted .

know i want to p post only some quantity into unrestricted and send back remaining into shop floor for re work  can anybody let me know how to do the process in SAP.

Regards,

Mahesh.. 

Accepted Solutions (1)

Accepted Solutions (1)

anand_rao3
Active Contributor
0 Kudos

Hi Mahesh,

You can post the not ok quantity in to Block Stock as very first step. If you arrive at decision that this should be reworked then you should transfer the same stock to another storage location designed for Rework with 343 movement. Once it is posted in to separate storage location meant for rework, you can then consume it to rework order as per the mapping done in PP module for this.

Anand

Answers (1)

Answers (1)

busyaban7
Active Contributor
0 Kudos

Hi Mahesh,

First of all thanks to Anand Rao for the correct answer. Yes, that's a very good approach.

There can be a few more approaches as well. In case if there is any rejection happened in the line, and user is not sure about the quality, they can "Block" the entire produce quantity with UD = R. After that do "Rework" of the defective pieces. Activate inspection type "08" and then do transfer posting with Tx MB1B/MvT 349, to post the entire stock to quality stock. Based on the final results, put UD = A or R, and keep repeating these steps until you achieve good quality.

Another approach I can think of is - you can post Partial good stock to "Unrestricted" use and faulty stock to "Blocked" stock form QA11 screen - stock posting tab, put UD for the 04 inspection lot quantity. At times, this process is not very usable to business based on SOP's followed in the plant..!! Then process the blocked material with MB1B/MvT 343/349 as already described.

Another approach could be - put only the good quantity of 04 inspection lots, to "Unrestricted stock", form QA11 screen but do not apply "UD" code. When this process is followed, the good quantity is moved to unrestricted stock with MvT 321 in the background though the UD is still not applied at Lot level. After that, you have only the suspicious / faulty quantity of materials in "Quality" stock, for the same "04" inspection lot. You can create a quality notification for Rework form RR or UD screen and then process it. After that if the produced material is Good, you can post UD = A. In case you wish to collect the second result after rework, you can activate inspection points, and process accordingly

Thanks,

Arijit