Release strategy should trigger in different systems EHP7 and ECC6

0 Kudos

Hi All,

At our client side some are using  ECC 6 and few are on EHP7.We need to define the release strategy in a such a way that both the user can approve the PR in cross system.For example- user A is  using ECC6 and he created PR ,now he need to take approval from his manager and manager is using the system EHP7 in such scenario-

  • how does the system understand who is the approver?
  • How to maintain the same user in both the system? so that approval process can not be disturb .
  • What about the release code ? how to define release code in both system for single release strategy


Thanks


Accepted Solutions (1)

Accepted Solutions (1)

JL23
Active Contributor
0 Kudos

you have got 2 different SAP systems, this is almost the same like you have a SAP system and I have a SAP system.

If you create a PR in your system and want me to release it, then I have to do this release in your system, not in mine.

My system does not know your purchase requisition, my system has not your release strategy setup.

If you have a person in county A who shall release a requisition for country C because he is a VIP with global responsibility, then he has to have a user in the system of country C and has to release it there.

Since you company is the owner of both systems and your basis team is probably hosting both systems, there might be options like single sign on which makes it easy for the user to switch between systems, and he can approve requisitions in both systems, still the user needs to be setup in that system.

It is even possible to approve a requisition from a mobile device. See the section Workflow in the blog

There you will find 3 links to documents that show how to release with a BlackBerry and via a Fiori App.

0 Kudos

Thank you Jurgen & Bijay,

We are working on email notification only.We will maintain the email id & agent name which need to be consider at the time of release strategy.(Email id will play imp role here).User will get the email notification because of the release strategy & workflow.

After clicking on link for PR approval( in outlook email) user will reach to SAP login page, so doesn't matter for user its EHP7 or ECC6.

I am sure this logic will work.

Thanks,

Snehal

Answers (2)

Answers (2)

0 Kudos

Hello,

1st thanks for reply.

We have ECC 6.0 as live system but getting used in only A & B country.We bought new fresh,blank system EHP7 for C county. We defined release strategy in EHP7 but we have HR module in ECC6 .So all portions are defined in ECC 6.

For example- I am creating PR in EHP7 & last level approver is in ECC 6 .

The issue is, in the ECC 6 system  how will he get the email notification of approval mail.?in EHP7 there is no HR module configured.

Thanks,

Snehal

former_member183424
Active Contributor
0 Kudos

(at least as of my knowledge) ECC and EHP both are different. ECC and EHP both has to be there in a system.

In one system, you should have one ECC version along with one EHP version.

You can't have only ECC in one system (without EHP) or only EHP in another system (without ECC).

Kindly share your release of software component (SAP_APPL) for your both system.

BijayKumarBarik
Active Contributor
0 Kudos

Hi,

Discuss with your Basis team to know about ECC 6.0 and how EHP7/EHP6/EHP5 are related to ECC.

Once you are confirmed about those differences- you can think about procurement business  on release strategy and e-mail notifications.

Regards,

Biju K

BijayKumarBarik
Active Contributor
0 Kudos

Hi,

Not sure about your question?

You have version ECC 6  and Enhancement Package 7 but what about earlier Enhancement Package No.?

Regards,

Biju K