Skip to Content
avatar image
Former Member

Issue with system communication settings


hi Experts,

We are implementing GTS 10.1 system. Required config is done in our dev box. in BD54 in Dev box we have defined our ECC feeeder system as DEVECC301.

In the org structure config for Assign Plant at Feeder System Level in dev sys we had maintained logical system as DEVECC301. now when this config transport request moves to assurance box by default we see the logical system as DEVECC301, where as in assurance the logical system should be TSTECC301.

One option was to use t code - BDLS and change logical system from DEVECC301 to TSTECC301. but in this case we may need to do BDLS every time we create & transport a new request.

pl let me know the best practise to be followed for this

Regards,

Santosh

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

3 Answers

  • Best Answer
    avatar image
    Former Member
    Apr 22, 2015 at 06:21 PM

    hi Santosh,

    Ideally, org. units should be mapped at Logical system group level as Dave and other suggested. But if you really feel, you don't want this to be changed now.

    You should be creating entries for all the Logical systems(Dev, QA and Prod) in your dev. client and move this to downstream system(like we do cross plant BOM based evaluation for Preference setup).

    For an example,

    DEVECC301   PLT-XXXX   LU-LUXXXX

    TSTECC301    PLT-XXXX   LU-LUXXXX


    But I would suggest to see if you change it to Logical system group.


    Thanks

    Dhilipan

    Add comment
    10|10000 characters needed characters exceeded

  • Apr 22, 2015 at 09:25 AM

    Hi Santosh,

    Best way is to configure at Logical System Group level, not LS level.  Then that problem goes away.

    Regards,

    Dave

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Santosh,

      I agree with Dave you should strongly consider changing the configuration to the logical system group level.

      I think you are setting yourself up for a lot of pain down the road.

      SAP recommends you use the logical system group concept.

  • avatar image
    Former Member
    Apr 23, 2015 at 07:31 AM

    hi Dave / Dhilipan / Christopher,

    thanks for the inputs I have changed the config to system group level. Also there is no issue with the previous documents.

    Regards,

    Santosh

    Add comment
    10|10000 characters needed characters exceeded