Incorrect Fixed duration in SNP PDS

Hi,

We are maintaining the capacity for “SNP Bucket Capacity” with number of periods as 7 days for resources in SAP APO.


However when we CIF the PDS the fixed duration for the activity is getting populated as 1 Day instead of 7 Days.

I have attached the document with setting for reference, request you to provide your input to resolve the issue.


Thanks,

Sanjog Mishrikotkar

PDS Issue1.PNG (98.8 kB)
PDS Issue.PNG (121.0 kB)
Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Jul 21, 2015 at 03:22 PM

    Hello Sanjog, How did you resolved the issue? We have a similar issue. Duration is 80 hours fixed in ECC master receipe. Resource is available for 8 hours per day, which means 10 days fixed duration.

    In APO, fixed duration is 4 days (80 / 24 hours) = 3.33 so 4 days.

    Ideally SNP fixed duration should be 10 days, as available SNP Bucket capacity is 8 hours per day and not 24 hours

    Regards,

    Bhavesh

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.