Skip to Content
avatar image
Former Member

Error during BW 7.4 execution phase - RUN_OFFLINE_MIGRATION

Hi Experts,

We are facing an issue with java upgrade in execution phase and in step RUN_OFFLINE_MIGRATION.

Upgrading from 7.01 SPS16 to 7.4 SP9

Below is the error popping up on SUM tool.


"Could not execute migration controllers for action migrate.database;migrate.deploy;migrate.engine.data;migrate.default.data and scenario calculated executed in slot . Error while processing migration list \SUM\sdt\data\mig\MIGRATIONAUSF.LST. Could not migrate some archives from migration list.Possible reason is Database is down.Check if database running Error during migration of archive \SUM\sdt\data\mig\DEPLOYARCHIVES\sap.com~tc~je~webservices~migration.sda which has been extracted to directory /SUM/sdt/migtool/sap.com~tc~je~webservices~migration.Possible reason is Database is down.Check if database running Could not execute MTI process. See log files \SUM\sdt\log\SWITCH\JMT_FRAMEWORK_09.OUT and \SUM\sdt\log\SWITCH\JMT_FRAMEWORK_09.ERR. Return code condition success evaluated to false for process java.exe for action RUN_MTI. Error during migration of archive \SUM\sdt\data\mig\DEPLOYARCHIVES\icm_migration.sda which has been extracted to directory /SUM/sdt/migtool/icm_migration.Possible reason is Database is down.Check if database running Could not execute MTI process. See log files \SUM\sdt\log\SWITCH\JMT_FRAMEWORK_09.OUT and \SUM\sdt\log\SWITCH\JMT_FRAMEWORK_09.ERR. Return code condition success evaluated to false for process java.exe for action RUN_MTI. "

Find attached JMT_FRAMEWORK_*.ERR and JMT_FRAMEWORK_*.out to analyse the logs.

Hoping for a quick reply. Thanks in advance !!!

Praveen

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

3 Answers

  • Apr 08, 2015 at 02:29 PM

    Hi Praveen,

    Please check the database ,It is up and running and it is possible to connect to DB.

    BR

    AKJ

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Jun 06, 2015 at 07:29 PM

    Dear Praveen,

    Could you please help with the solution as I am facing the same issue, after the same scenario.

    Regards

    Baranedharan S.

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Jun 07, 2015 at 11:27 AM

    Thanks to All trying to help with this.

    The issue is resolved by dropping the extra server node from Config tool

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Hello Manish.

      I too had a problem in step RUN_OFFLINE_MIGRATION.  The log files contain the same errors as noted in this thread.  The solution suggested as per OSS note 1915023 did not resolve the problem.  In log file MTI_COM_SAP_SECURITY_MIGRATION_ENGINE_DATA_MC*.ERR, I found the following text:


      ------------------------------------------------------------------------------------------------------------------------------------------

      com.sap.security.core.migration.com_sap_security_migration.engine_data_mcerr [Thread[main,5,main]] Error: Error while migrating

      controller com.sap.security.core.migration.UMEServiceRFCDataController. CSN component - BC-JAS-SEC-UME . Reason: The RFC connection data in the source sy

      stem are conflicting because they contain data for direct server connection (ASHOST/SYSNR) as well as for load balanced connection (MSGHOST/GROUP/R3NAME)

      . This set of data cannot be migrated. If the source engine does not use ABAP connectivity any more, clear these properties. If the source engine still uses ABAP connectivity, choose one of the possible connection types (direct or load balanced) by clearing the other set of properties.

      com.sap.security.core.migration.com_sap_security_migration.engine_data_mcerr [Thread[main,5,main]] Error:

      ------------------------------------------------------------------------------------------------------------------------------------------


      The solution for me was found in the troubleshooting guide:

      (SUM) RUN-OFFLINE-MIGRATION Solution page - Technology Troubleshooting Guide - SCN Wiki

      which refers us to OSS note 1383004.  The UME configuration is pointing to an ABAP backend and has both the message server and primary application host defined.  As per the note, I removed the PAS host and system number and repeated the failed step.


      Mary-Anne