SAP PS-PM integration

Hi Experts,

Currently we are linking WBS elements to capture Maintenance labor and maintane parts for a project specific work orders?

Our business would like to use Network and dmultiple activties to capture Labor and maintence cost?

I am aware that Networks can be linked to Work order and Network must be mainatined as Optional in Settlement Profile?

What is the best practice to link? Networks or Subnetworks?

Please advise.

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

6 Answers

  • Posted on Apr 08, 2015 at 03:33 AM

    Hi Ashely,

    you can assign WBS/Network as account assignment and when order completes than settle all the cost to same account assigned object.

    thanks

    Sunil

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Apr 08, 2015 at 06:52 AM

    Hi Ashely,

    The account assignment object for PM Work Orders would be a Network Activity (NWA). But it actually does not mean you have to settle work orders to NWA.

    Regards,

    Paulo

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Apr 25, 2015 at 10:45 AM

    Dear,

    The best way to have control over your maintenance budget over "Main work center"i.e department like Mechanical,electrical and Instrumentation and civil etc..

    First step:

    You need to have Over head project and for which system should not create "AUC" for that WBS element.

    Every year you need to have new Over head project for that financial year.

    Second Step:

    Create a "Z-TABLE"i.e custom table and have assignment of WBS element to "Main work center" with respective financial year.

    Here you need to have save exit for maintenance order with respect to "Main work center" an d "WBS element" assignment of "Custom table entries.

    Third Step:

    Assign the "WBS element" in maintenance order "Additional data".

    Now system will check the planned cost or actual cost of the maintenance order against WBS element assigned.If budget is available , system will process or else it will populate an error message.

    Regards,

    Pardhu

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Apr 27, 2015 at 04:04 AM

    Hello,

    Best part of integration between PM-PS wbs to be assign in additional tab of maintenance order.

    Regards,
    Sanjeev

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Apr 28, 2015 at 12:15 AM

    Can anyone please advise me on OPTP?

    I am clear with using the Control key-PS01(Internal Processing)

    Not sure what to use for Network Type SubNtwrk and Network type Replaced act since we are using only Activty Assigned Network (PS02)

    *Please advise.

    Add a comment
    10|10000 characters needed characters exceeded

    • Hi Ashley,

      In OPTP the first field is the work order type (that is called Network type subnetwork, might be confusing to call order as subnetwork) and second field is the Network type.

      Networks and orders share same table, so technically they are the same object and sometime orders are called networks and networks are called orders.

      Inside the combo settings you can leave everything blank to start with. The important thing is to define allowed combinations for Network/Order assignments.

      Regards,

      Paulo

  • Posted on Apr 28, 2015 at 07:22 AM

    Thanks Guys.Appreciate your help.The issue has been fixed.

    Special thanks to Paulo and Saradhi.

    Closing the thread.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.