Skip to Content

How can i stock assets with UNBW material type in SAP MM

Hello,

The requirement is that in our scenario we purchase assets and want to show these assets in stock please suggest me how it can be possible through UNBW material type.If i will purchase two assets and one is for cost center other is for stock then how we will do GR.

Regards

Atif

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Apr 06, 2015 at 05:17 AM

    Hi,

    As you know UNBW itself is a non- valuated material. Even when you create PO for UNBW material, stock will get updated but value will not be updated in material master.

    For stock, create PO with blank account assignment, material will be stocked.

    For cost center, put K in accc assignment field in PO. the material will get directly consumed to cost center but will not be stocked.

    Hope this clears your doubt.

    Regards,

    Priti

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.