How to start 3 separate Job Chains "independently".

Hi,

I have four (4) Job Chains, and I would like all four to start (may be together), but independently (means, If one fails or any part of one fails the other chains should not stand still) with one push of a button (scheduled or on-demand).

Should I create an "Event" and add that Event to all four Job Chain's "Wait Event" area, and when ever I want to run, I should manually "Raise Event" so all will start?

Job Chain 1 = (Job 1.1 - Job 2.1 - Job 3.1 - Job 4.1 - Job 5.1 - Job 6.1)

Job Chain 2 = (Job 1.2 - Job 2.2 - Job 3.2 - Job 4.2 - Job 5.2 - Job 6.2)

Job Chain 3 = (Job 1.3 - Job 2.3 - Job 3.3 - Job 4.3 - Job 5.3 - Job 6.3)

Job Chain 4 = (Job 1.4 - Job 2.4 - Job 3.4 - Job 4.4 - Job 5.4 - Job 6.4)

Please let me know what would be the best solution.

Thank you,

Junoon

Capture.PNG (11.8 kB)
Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Mar 30, 2015 at 08:44 PM
    1. Create another job chain, say MASTER_CHAIN
    2. Add Step 1
    3. Add all the four job chains in step 1
    4. Run the Master Chain, when ever you want.

    thanks

    Nanda

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.