Skip to Content
0

Copy and paste for plan data in design studio application

Jan 30, 2017 at 03:59 PM

222

avatar image

Hello,

what are the options of copy and paste plan data out of and into a table in a design studio application, which is planning enabled?

we are on design studio version1.6 SP1 Patch 2

thanks and best regards

Cornelia

10 |10000 characters needed characters left characters exceeded
0
* Please Login or Register to Answer, Follow or Comment.

2 Answers

Cornelia Lezoch Jan 31, 2017 at 01:55 PM
0

Hi Tammy,

thanks for the reply. I am still in concept phase and try to figure out, what we should put onto the to do list and what not to use ...

But I will check the spreadsheet as soon as possible.

best regards

Cornelia

Share
10 |10000 characters needed characters left characters exceeded
avatar image
Former Member Jan 31, 2017 at 04:32 PM
0

We used a third party component in 1.5 from a company called abracon. This worked perfectly for us

https://www.abracon.de/abracon-copy-and-paste.html

Also in 1.6 onwards Desing Studi is having a spreadsheet component which Tammy has already mentioned.

Share
10 |10000 characters needed characters left characters exceeded